1、

The content, manage method and emphasis of highway engineering cost are talked in the paper.

通过具体事例说明管理好工程量清单中措施项目费的重要性.

互联网摘选

2、

The engineering cost is listed independently.

设计费单独列出.

互联网摘选

3、

Follow engineering cost spending.

工程帐目管理,预算跟踪.

互联网摘选

4、

Control, consolidate and report engineering cost and performance.

控制 、 汇总、汇报工程费用和其实际运用.

互联网摘选

5、

The paper introduces computer application in engineering cost management and the prospect.

介绍了计算机在工程造价管理中应用的现状及前景.

互联网摘选

6、

Power engineering cost has many corpuses, many stage, dynamic and system characteristicses.

电力工程造价管理具有多主体性 、 多阶段性 、 动态性及系统性特点.

互联网摘选

7、

Does the total price of all equipments include engineering cost?

所有设备包括了设计费 吗 ?

互联网摘选

8、

The engineering cost is gradually determined till reflecting the practical engineering.

工程造价的确定过程是个逐步深化直至反映工程实际的过程.

互联网摘选

9、

Most industrial persons and economists highly appreciate the price quotation system in engineering construction fields of China. The most urgent task now is to separate the quantity from price in the quotation, let the consumption amount become the national standard and cost become the market information.

大多数业内人士和经济学者非常赞赏我国工程建设领域中的定额体系,现在最紧迫的任务是使定额中的量与价分离,使消耗量成为国家标准,使造价成为市场信息。

互联网摘选

10、

Discussion on project cost control of private investing engineering at invite public bidding stage

关于民营投资工程项目在施工招标阶段对工程造价控制的思考

互联网摘选

11、

Therefore, how to make the cost management mode of highway engineering accommodate to the Chinese economy increasing is one important program to solve urgently.

因此,如何改革公路工程造价管理模式以适应我国市场经济的发展是当前迫切需要解决的重要课题。

互联网摘选

12、

The brief analysis on the characteristics of port engineering project are made in the paper. The main measures for lowering the cost of port project are also proposed in it by summing up the experiences of insite construction and management.

简要分析港口工程项目的特点,并通过现场施工管理经验的总结,提出港口项目在施工过程中降低成本的主要措施。

互联网摘选

13、

The paper presented 12 switching device schemes for a medium voltage power distribution networks in Guyuan, Ningxia, assessed the schemes with the cost-benefit analysis and obtained the best schemes. The engineering applicability and correctness are verified by the case.

应用成本效益分析法对宁夏回族自治区固原市某10kV中压配电网的12套开关配置方案进行评估,得出了最优方案,验证了该方法的工程实用性。

互联网摘选

14、

When paid to75% of provisional lump sum price, the company will cease any progress payment, both parties shall commence the final financial settlement based on the actual project budgetary investment engineering cost and the factors, discounts, percentage set force here under.

当支付金额达到暂定包干价格的75%时,业主将停止支付所有工程进度款,这时,合同双方应依据实际的项目预算内投资工程费用及下述调整因素、折扣和百分比进行最终财务结算。

provided by jukuu

15、

BTO, availability microbe technology, is widely used with advantages of low cost, high output, no pollution eco-agriculture and environmental engineering.

“BTO”有益微生物技术是应用范围广、低投入 、 高产出、无公害 、 无污染的生态农业、环保工程应用项目.

互联网摘选

17、

With the improvement of the requirements in high efficiency, low cost and environmental protection of petroleum industry, vehicle-mounted pressure balancing workover rig has an important engineering value.

随着石油行业对修井作业高效率、低成本和环保要求的不断提高,本文涉及的车载式不压井修井机具有重要的工程应用价值。

互联网摘选

19、

So it is important to optimize construction technics and reduce working procedure and cut time limit for the project and reduce engineering cost.

如何优化施工工艺,减少施工工序,缩短工期,降低工程造价就显得尤为重要。

互联网摘选

20、

However, often because of the time restraints in design phase, the structures design alternatives, cost estimating and optimization are seldom considered in the structure engineering.

但是,由于设计阶段的时间限制,一般很少针对结构工程进行多方案的设计、成本估计和优化。

互联网摘选

  • 今日热词
  • 热门搜索

简答网英语词典(dict.jiandongshicai.cn)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:(如需回复请填写联系方式)
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈